Building PermitWhat is the Purpose of this Permit?Permits to construct permanent buildings or additions to existing facilities are required by counties and cities, except under certain circumstances. The application requires detailed final plans for structures including electrical plan, plumbing plan, floor layout, sewage facilities, location of wells (if applicable), drainage plan, size and shape of lot and buildings, setback of buildings from property lines and drainfield (if applicable), access, size and shape of foundation walls, beams, air vents, window accesses, and heating or cooling plants, if included in the design. Permits are issued upon approval of the plans. Permit processing time varies depending on the project, but averages from six to eight weeks. Public hearings requirements also vary depending on activity proposed.
Who issues this Permit?Local Government - City or County What Activities Require this Permit?Construction of permanent buildings or additions to existing facilities. How Much Will this Permit Cost?Variable. Check with local government. Legal Authority:Links:Statewide Contact:Planning Departments For assistance contact 1-800-917-0043 (Office of Regulatory Assistance). Website: http://www.mrsc.org/research.aspx * Permit information last updated 5/7/2012. |
|||
![]() |
|||
|
Department of Ecology Environmental Permitting Project Questionnaire © ORA |