Ecology > EIM > Search Database EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations Locations Results Results Go to Map Go to Map Download All Download All

User Study IDbcar0002
Study NameHenderson-Nisqually GW
Study Implementation StatusCOMPLETED
Study PurposeTo characterize groundwater and spring water quality representative of groundwater entering McAllister and Woodland Creeks.
Study TypeTotal Maximum Daily Load (TMDL) development
Study QA Planning Level3
Study QA Assessment LevelLevel 5 - Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Start Date9/1/2002
Study End Date1/13/2006
Study Responsible EntityECY-EAP
Study Ecology Lead/ContactCarey, Barb
Study Grant/Loan Number
Study Area Name
Study Area Description
Study Area Type
Study Result Description
Study QA Project Plan Description
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study BibliographyQuality Assurance Project Plan: Henderson and Nisqually TMDL Study
Appendices: Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study


  Top | Ecology | EIM | Search Database | Submit Data | MyEIM | Downloads | Help | About | Contact Us

EIM Database Search 2006  Data Disclaimer  Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.