Home
Search Database
Submit Data
MyEIM
Downloads
Help
About
Contact Us
Ecology >
EIM >
Search Database
EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations
Results
Go to Map
Download All
User Study ID
STEB0001
Study Name
Naches River Temperature TMDL
Study Implementation Status
COMPLETED
Study Purpose
To characterize water temperatures in the basin and establish load capacities and load and wasteload allocations for heat sources to meet WQ standards for surface water temperature.
Study Type
Total Maximum Daily Load (TMDL) development
Study QA Planning Level
4
Study QA Assessment Level
Level 3 - Data Verified and ASSESSED FOR USABILITY
Study Start Date
9/1/2004
Study End Date
8/30/2007
Study Responsible Entity
ECY-EAP
Study Ecology Lead/Contact
Brock, Stephanie
Study Grant/Loan Number
Study Area Name
Study Area Description
Study Area Type
Study Result Description
Study QA Project Plan Description
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study Bibliography
Quality Assurance Project Plan: Naches River Temperature Total Maximum Daily Load
Addendum to Quality Assurance Project Plan: Naches River Temperature Total Daily Maximum Load Study.
Groundwater-Surface Water Interactions along the Naches and Tieton Rivers, Summer and Fall 2004
Upper Naches River Temperature Total Maximum Daily Load: Volume 1, Water Quality Study Findings
Top
|
Ecology
|
EIM
|
Search Database
|
Submit Data
|
MyEIM
|
Downloads
|
Help
|
About
|
Contact Us
EIM Database Search 2006
Data Disclaimer
Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.