Home
Search Database
Submit Data
MyEIM
Downloads
Help
About
Contact Us
Ecology >
EIM >
Search Database
EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations
Results
Go to Map
Download All
User Study ID
PMART003
Study Name
Saginaw Mill Groundwater Monitoring
Study Implementation Status
COMPLETED
Study Purpose
Collect current groundwater data for formaldehyde to assess progress of ongoing phytoremediation.
Study Type
Performance monitoring for emergency or interim cleanup action at contaminated site
Study QA Planning Level
4
Study QA Assessment Level
Level 5 - Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Start Date
9/1/2004
Study End Date
Study Responsible Entity
ECY-EAP
Study Ecology Lead/Contact
Marti, Pam
Study Grant/Loan Number
Study Area Name
Study Area Description
Study Area Type
Study Result Description
Study QA Project Plan Description
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study Bibliography
Quality Assurance Project Plan: Saginaw Mill Groundwater Monitoring
Saginaw Mill (Aberdeen) Groundwater Monitoring Results, April and August 2006
Top
|
Ecology
|
EIM
|
Search Database
|
Submit Data
|
MyEIM
|
Downloads
|
Help
|
About
|
Contact Us
EIM Database Search 2006
Data Disclaimer
Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.