Ecology > EIM > Search Database EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations Locations Results Results Go to Map Go to Map Download All Download All

User Study IDKSIN0007
Study NameSW/GW interactions - Walla Walla R. watershed (WRIA 32)
Study Implementation StatusONGOING
Study PurposeThis study will assess surface water and groundwater interactions along the mainstem Walla Walla R. and it's major tributaries the Touchet R., Mill Ck., Yellowhawk Ck., and Coppei Ck.
Study TypeTotal Maximum Daily Load (TMDL) development
Study QA Planning Level4
Study QA Assessment LevelLevel 5 - Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Start Date7/8/2002
Study End Date8/31/2005
Study Responsible EntityECY-EAP
Study Ecology Lead/ContactSinclair, Kirk
Study Grant/Loan Number
Study Area NameWRIA 32, Walla Walla
Study Area DescriptionWater Resource Inventory Area 32, Walla Walla River watershed
Study Area TypeOTHER
Study Result Description
Study QA Project Plan DescriptionA formal Quality Assurance Project Plan (QAPP) is available for this study.
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study BibliographyQuality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load
Assessment of Surface Water and Groundwater Interchange in the Walla Walla River Watershed


  Top | Ecology | EIM | Search Database | Submit Data | MyEIM | Downloads | Help | About | Contact Us

EIM Database Search 2006  Data Disclaimer  Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.