Home
Search Database
Submit Data
MyEIM
Downloads
Help
About
Contact Us
Ecology >
EIM >
Search Database
EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations
Results
Go to Map
Download All
User Study ID
JICA0001
Study Name
Palouse River TMDL
Study Implementation Status
ONGOING
Study Purpose
Palouse River TMDL to address 303(d) listings for high water temperature, high fecal coliform bacteria counts, low dissolved oxygen, and high pH.
Study Type
Total Maximum Daily Load (TMDL) development
Study QA Planning Level
4
Study QA Assessment Level
Level 3 - Data Verified and ASSESSED FOR USABILITY
Study Start Date
5/1/2007
Study End Date
Study Responsible Entity
ECY-EAP
Study Ecology Lead/Contact
Carroll, Jim
Study Grant/Loan Number
Study Area Name
Study Area Description
Study Area Type
Study Result Description
Study QA Project Plan Description
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study Bibliography
Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study
Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study
Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design
Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study-Water Quality Study Design
Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek
Top
|
Ecology
|
EIM
|
Search Database
|
Submit Data
|
MyEIM
|
Downloads
|
Help
|
About
|
Contact Us
EIM Database Search 2006
Data Disclaimer
Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.