Ecology > EIM > Search Database EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations Locations Results Results Go to Map Go to Map Download All Download All

User Study IDJICA0001
Study NamePalouse River TMDL
Study Implementation StatusONGOING
Study PurposePalouse River TMDL to address 303(d) listings for high water temperature, high fecal coliform bacteria counts, low dissolved oxygen, and high pH.
Study TypeTotal Maximum Daily Load (TMDL) development
Study QA Planning Level4
Study QA Assessment LevelLevel 3 - Data Verified and ASSESSED FOR USABILITY
Study Start Date5/1/2007
Study End Date 
Study Responsible EntityECY-EAP
Study Ecology Lead/ContactCarroll, Jim
Study Grant/Loan Number
Study Area Name
Study Area Description
Study Area Type
Study Result Description
Study QA Project Plan Description
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study BibliographyQuality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study
Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study
Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design
Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study-Water Quality Study Design
Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek


  Top | Ecology | EIM | Search Database | Submit Data | MyEIM | Downloads | Help | About | Contact Us

EIM Database Search 2006  Data Disclaimer  Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.