Home
Search Database
Submit Data
MyEIM
Downloads
Help
About
Contact Us
Ecology >
EIM >
Search Database
EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations
Results
Go to Map
Download All
User Study ID
CHPI001
Study Name
Moses Lake TMDL Groundwater Study
Study Implementation Status
COMPLETED
Study Purpose
To investigate the nutrient content of the groundwater inflow to Moses Lake in support of the Moses Lake Phosphorus TMDL study
Study Type
General Environmental Study
Study QA Planning Level
4
Study QA Assessment Level
Level 5 - Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Start Date
5/29/2001
Study End Date
Study Responsible Entity
ECY-EAP
Study Ecology Lead/Contact
Pitz, Charles
Study Grant/Loan Number
Study Area Name
WRIA 41, Lower Crab
Study Area Description
Water Resource Inventory Area 41, Lower Crab Creek Watershed
Study Area Type
OTHER
Study Result Description
Study QA Project Plan Description
There is an approved Quality Assurance Project Plan QAPP available for review that describes the procedures used for this study.
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study Bibliography
Quality Assurance Project Plan: Characterization of the Groundwater Discharge to Moses Lake, Washington
Moses Lake Total Maximum Daily Load Groundwater Study
Top
|
Ecology
|
EIM
|
Search Database
|
Submit Data
|
MyEIM
|
Downloads
|
Help
|
About
|
Contact Us
EIM Database Search 2006
Data Disclaimer
Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.