Ecology > EIM > Search Database EIM data last updated on Friday, November 20, 2009
Detail: Study
Locations Locations Results Results Go to Map Go to Map Download All Download All

User Study IDCHPI001
Study NameMoses Lake TMDL Groundwater Study
Study Implementation StatusCOMPLETED
Study PurposeTo investigate the nutrient content of the groundwater inflow to Moses Lake in support of the Moses Lake Phosphorus TMDL study
Study TypeGeneral Environmental Study
Study QA Planning Level4
Study QA Assessment LevelLevel 5 - Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Start Date5/29/2001
Study End Date 
Study Responsible EntityECY-EAP
Study Ecology Lead/ContactPitz, Charles
Study Grant/Loan Number
Study Area NameWRIA 41, Lower Crab
Study Area DescriptionWater Resource Inventory Area 41, Lower Crab Creek Watershed
Study Area TypeOTHER
Study Result Description
Study QA Project Plan DescriptionThere is an approved Quality Assurance Project Plan QAPP available for review that describes the procedures used for this study.
Study Special Requirements
Study Resource Estimate
Study Lab Cost Estimate
Study BibliographyQuality Assurance Project Plan: Characterization of the Groundwater Discharge to Moses Lake, Washington
Moses Lake Total Maximum Daily Load Groundwater Study


  Top | Ecology | EIM | Search Database | Submit Data | MyEIM | Downloads | Help | About | Contact Us

EIM Database Search 2006  Data Disclaimer  Privacy Notice.
Copyright © 2006 Washington State Department of Ecology. All Rights Reserved.